London's Pulse: Medical Officer of Health reports 1848-1972

View report page

Bethnal Green 1883

[Report of the Medical Officer of Health for Bethnal Green]

This page requires JavaScript

22
Naming Spicer, Buxton, and Luke Streets, in this Parish
and in the Hamlet of Mile End New Town
throughout Buxton street.
And re-numbering.
Naming Bartbolomew Place, Cudworth and Newport
streets throughout Cudworth street.
And re-numbering.
Re-numbering Barnsley street.
Naming Somerford street and New Somerford street
throughout Somerford street.
And re-numbering.
Naming Ely place Lansdell place.
He-numbering Tapp street.
Ditto Lisbon street.
Naming Temple terrace and Barnsley street throughout
And re-numbering. Barnsley street.
Re-numbering Collingwood street
Ditto Three Colts lane
Naming Essex street, Three Colts lane Buckhurst street
Naming Princes street, Virginia Row Chambord street
Naming Duke street, Brady street Ducal street
Naming New street, Gosset street Newling street
Naming Norfolk street, Three Colts lane Fellbrigg street
Re-numbering a part in this Parish and a part in Shore-
ditch Parish of Bethnal Green road.
Re-numbering the part in this Parish and the part in
Shoreditch Parish of Pritchard's road.
Naming Pereira street and Duke street, partly in this Parish
and partly in "Whitechapel, throughout Pereira street.
And re-numbering.
Naming Brick lane, Turk street, and Herat street throughout Brick lane.
And re-numbering.
Re-numbering Mount street.
Ditto Alma road.
Naming Cranbrook place, Cranbrook street, and Nelson
place throughout Cranbrook street.
And re-numbering.
NEW CARRIAGEWAY PAYING.
The Vestry deemed it desirable that the Carriageways of
Bishop's road
"Winchester street
Globe road
North Side of Victora Park square
Brady street
Old Bethnal Green road
should be paved, and have borrowed to meet the cost, from the
Metropolitan Board of Works, £15,000 at £3 10s. per cent. interest,
and to be repaid by 20 equal annual instalments.
A Contract for the execution of the work by Mr. J. J. Griffiths, of
Kingsland Road, was entered into, and the greater part of the work
has been completed.