Table: Continued from previous page...
Download table as:
text
HTML
CSV
XML
Continued from previous page...
£ s. d. £ s. d. Brought forward 435 16 11 1,830 14 8 Add 10 per cent. upon cost of plant in stock (£115 : 14 : 5) 11 11 5 Add 10 per cent, upon part cost of Crusher, Barrows,&c.(£40:9:6) 4 1 0 Add part cost of goods used in connection with plant 15 2 7 466 11 11 Total cost of production £2,297 6 7
![]()
match: ALTO ComposedBlock ..\01 May 2013\Folder 7\b19875368\Tables\b19875368_0113_010_032.xml
Table: BY SALE OF MATERIALS.Sale of Materials Cash received in paymant of goods delivered or Works executed:-
Download table as:
text
HTML
CSV
XML
BY SALE OF MATERIALS.
Sale of Materials Cash received in paymant of goods delivered or Works executed:-
Tar Paving. £ s. d. £ s. d. New Roads 1,339 2 10 Private Works, Gas & Water Trenches, &c. 102 19 6 General Repairs 978 2 2 New Highway Work 539 18 4 2,960 2 10 Silica Paving. New Highway Work, Northcote Road 269 18 4 3,230 1 2 Deduct cost of Production 2,297 6 7 Net Profit on the year £932 14 7 In addition to the foregoing, the value of the manufactured goods in stock on the 25th day of March, 1890, was as follows:— Tar Paving. 281 yards cube bottoming 98 7 0 86 „ „ topping 47 6 0 145 13 0 Silica Paving. 1,923 yards sup. paving 240 7 6 — — 240 7 6 Value of Stock in hand £386 0 6
![]()
match: ALTO ComposedBlock ..\01 May 2013\Folder 7\b19875368\Tables\b19875368_0113_010_033.xml