Hints from the Health Department. Leaflet from the archive of the Society of Medical Officers of Health. Credit: Wellcome Collection, London
[Report of the Medical Officer of Health for Edmonton]
This page requires JavaScript
Continued from previous page...
Roofs repaired | 140 |
Gutters and rainwater pipes repaired | 142 |
Brickwork or pointing repaired | 21 |
Chimney stacks, etc., repaired or rebuilt | 24 |
Yards or forecourts repaved or repaired | 10 |
Drains examined, tested or exposed | 363 |
Drains cleared, trapped or repaired | 94 |
Drains reconstructed | - |
Chambers inserted or built-up to ground level | 5 |
Soil and vent pipes, new fixed or repaired | 38 |
W.C.'s repaired or improved | 123 |
Flushing cisterns repaired or new fixed | 27 |
Sink waste pipes repaired or new fixed | 26 |
New sinks fixed | 2 |
Drinking water cisterns covered, cleansed, repaired | 3 |
Water fittings repaired | 35 |
Water taken off main or restored | 4 |
Internal Walls | 99 |
Ceilings repaired, cleansed, etc. | 85 |
Doors frames repaired | 10 |
Floors repaired | 24 |
Floors ventilated | 1 |
Dampness remedied | 20 |
Gullies repaired | 38 |
Dangerous fence | 1 |
Sills repaired | 15 |
Doorsteps repaired | 2 |
Window frames or sashes repaired or renewed | 67 |
Fireplaces, stoves repaired | 13 |
Coppers repaired | - |
New dustbins supplied | 6 |
Premises rat-proofed | - |
Improper keeping of animals discontinued | - |
Foul accumulations removed | 11 |
Other nuisances abated | 18 |
Moveable dwellings removed | - |
New boiler house constructed | - |
New boiler installed | - |
Factory sanitary conveniences inspected | 1 |
Factory sanitary conveniences improved | 2 |
Factory other defects remedied | 2 |
Petroleum installations - defects remedied | - |
Petroleum installations tested | - |
Smoke Abatement.- boiler plants improved | - |
Food Regulations - contraventions remedied | - |
Internal doors repaired | 3 |