forecourt wall, the kerb and footway at the corner of the two roads
have been set back at a cost of £43 1 s. 3d., inclusive of the £20 paid
to the leaseholder. This setting back of the footway has added a piece
of ground to the carriageway, and enabled a much safer and more convenient
corner to be made for vehicular traffic. The ground added
to the carriageway at the south-east and south-west corners of Thornhill
Road has been paved with granite setts, and the levels of the
existing carriageway between No. 6 and Richmond Road much improved
at a total cost of £30 0s. 6d.
Richmond Road—at the junction with Thornhill Road. The
pitching has been re-laid to improved levels, and a paved refuge constructed
at the intersection of these roads at a cost of £32 16s. 7d.
Richmond Road—south side, at the east corner of Barnsbury Road.
The width of the footway has been reduced, the kerb set back, and a
portion of the footway added to the carriageway at a cost of £2 13s. Id.
Caledonian Road—west side, from Brewery Road to Market Road.
A new sub-kerb has been placed alongside the high part of the footway
at a cost of £38 10s. 1d.
Alma Grove—Copenhagen Street. A kerbed and paved footway has
been formed on the west side of this thoroughfare, between the rear of
No. 80, Copenhagen Street, and the north end of the road, at a cost of
£41 5s. 3d. There is now a paved footway on the west side the entire
length of the road.
Charlton Crescent — south side, at the Hank of No. 10, Colebrooke
Terrace. A strip of ground containing 11 1/3 yards super, between the
back line of the footway paving and the yard wall of No. 10, Colebrooke
Terrace, has been paved and added to the footway at a cost of
£4 6s. 4d.
Pentonrille Road—at the east corner of Caledonian Road. In order
to allow of the tram lines in Pentonville Road being altered so that the
St. Pancras Vestry could place two refuges in the centre of the road
opposite the Metropolitan Railway Station, the kerb has been set back
and a portion of the footway has been added to the carriageway and
paved with granite setts at a cost of £11 18s. 4d. The two new
refuges referred to have been constructed by the St. Pancras Vestry,
the London Streets Tramways Company having altered their tram lines
in order to admit of the refuges being placed in the centre of the road.