[Report of the Medical Officer of Health for St. Saviour's]
This page requires JavaScript
26
The following works have been executed in reinstating
trenches after gas, water, electric light, hydraulic power and
other companies:—
SOUTH METROPOLITAN GAS COMPANY.
Carriageways.
| Macadam relaid | 717/9 yds. supl. |
| Granite pitching relaid | 1150 ⅓ „ „ |
| Wood paving relaid | 104 7/9 „ „ |
| 6 inches lias lime concrete under ditto | 1150 ⅓ „ „ |
| 3 „ Portland cement concrete under ditto | |
| 6 „ „ „ „ „ | |
| 9 „ „ „ „ „ | 815/9 „ „ |
| Ground excavated and carted away for concrete space | 215¼ „ cube |
| New wood paving | No. 255 deal blocks |
| 469 Jarrah „ |
Footways.
| Old York paving relaid | 8033 ft. supl. |
| New „ „ laid | 546 „ „ |
| New Victoria paving laid | 56 „ „ |
| Old curb refixed | 310 „ lineal |
| Block channel refixed | 91 „ „ |
SOUTHWARK AND VAUXHALL WATER COMPANY.
Carriageways.
| Macadam relaid | 4 yds. supl. |
| Granite pitching relaid | 390 ⅓ „ „ |
| Wood paving relaid | 455/9 „ ,, |
| 6 inches lias lime concrete under ditto | 386 ⅓ „ „ |
| 6 „ Portland cement concrete under ditto | 26 ⅓ „ ,, |
| 72 2/9 ,, cube | |
| Ground excavated and carted away for concrete space | 70 ½ „ cube |
| New wood paving | No. 816 deal blocks |
| „ „ „ | No.100 Jarrah „ |