Yds. | Feet. In. | £ | s. | d. | |||
---|---|---|---|---|---|---|---|
84 | 3 | run Circular Kerb | 2/3 | 9 | 9 | 7 | |
Excavation and Concrete. | 36 | 15 | 0 | ||||
No. 1 2-ft. Block | 0 | 9 | 6 | ||||
2249 | 6 | super. 3-in. York Stone Paving | 0/9 | 84 | 7 | 2 | |
89 2/3 | super. 4 by 4 Crossings | 7/0 | 31 | 7 | 8 | ||
34 | run 5 by 7 Arris Course | 1/0 | 1 | 14 | 0 | ||
Excavation and Concrete for Crossings | 11 | 18 | 6 | ||||
38 | run 12 by 8 Swedish Kerb | 1/10½ | 3 | 11 | 3 | ||
13 | 9 | run 12 by 8 Aberdeen Circular Kerb | 2/3 | 1 | 10 | 11 | |
279 | 9 | run 5 by 7 Channel. | 1/3½ | 18 | 1 | 4 | |
6782 | super. 3-in. Tooled York Stone Paving | 0/9 | . 254 | 6 | 6 | ||
Path St. Matthew's Church, West Kensington Park. | |||||||
931 | super. 3in. York Stone Paving | 0/9 | 34 | 18 | 8 | ||
98 | 4 | run 12 by 8 Swedish Kerb | 1/10½ | 9 | 4 | 5 | |
13 | 6 | run 12 by 8 Circular Kerb | 2/3 | 1 | 10 | 4 | |
28½ | super. 4 by 4 Crossings | 7/0 | 9 | 19 | 6 | ||
52 | Arris Course | 1/0 | 2 | 12 | 0 | ||
27 | 5 by 7 Channel. | 1/3½ | 1 | 14 | 11 | ||
Excavation, Concrete, &c. | 6 | 9 | 6 | ||||
King Street West (Hunt's Shop). | |||||||
15 | 6 | run 12 by 8 Kerb | 1/10½ | 1 | 9 | 1 | |
435 | super. 3-in. York Stone Paving | 0/9 | . 16 | 6 | 3 | ||
Cab Rank, Shepherd's Bush Green. | |||||||
301 2/9 | super. 3 by 7 Pitching on Concrete | 15/0 | . 225 | 18 | 0 | ||
Works in King Street West in connection with Wood Paving. | |||||||
1150 | 7 | run New 12 by 8 Kerb | 1/9 | 100 | 13 | 6 | |
183 | 6 | run Circular ,, | 2 0 | 18 | 7 | 0 | |
4907 | 9 | super. 3-in. York Stone Paving | 0/9¼ | 189 | 3 | 0 | |
13 | super. 4 by 4 Crossings | 8/11 | 5 | 15 | 11 | ||
No. 2 2-ft. Blocks | 14/0 | 1 | 8 | 0 | |||
200 | Materials for Raising Path | 3/0 | 30 | 0 | 0 | ||
Brook Green Road (South Side) | |||||||
6108 | 9 | run 12 by 8 Kerb | 1/9 | 534 | 10 | 4 | |
252 | 4 | run Do. Circular Kerb | 2/0 | 25 | 4 | 8 | |
6625 | 6 | run Channel on Concrete | 1/8 | 552 | 2 | 6 | |
7529 | 8 | super. 3-in. York Stone Paving | 0/9¼ | 290 | 4 | 1 | |
101 6/9 | super. Dressed Granite Crossings on Concrete | 17/6 | 88 | 19 | 3 | ||
30 6/9 | super. 4 by 4 Crossings on Concrete | 8/11 | 13 | 13 | 6 |