Hints from the Health Department. Leaflet from the archive of the Society of Medical Officers of Health. Credit: Wellcome Collection, London
[Report of the Medical Officer of Health for Redbridge]
This page requires JavaScript
106
samples were taken from houses in various parts of the supply
area for bacteriological examination, all of which proved
satisfactory. The fluoride content of the various supplies is
0.25 p.p.m.
The following mains were laid in Redbridge during 1966:-
3 ins. 4 ins. 6 ins.
Yards 263 191 125
No supplementary supplies of water were obtained from the
Metropolitan Water Board.
The Council has approved in principle the addition of
fluoride to public water supplies.
The Borough is not supplied with water from any public
wells nor are there any private supplies providing domestic
water to the general public. The Public Health Inspectors
took 4 samples of water during the year, 3 being from ihe South
Essex Waterworks Company supply area and 1 from that of the
Metropolitan Water Board district and both the chemical and
bacteriological examinations gave satisfactory results.
School
Swimming
Baths
There are seven swimming baths in *maintained* schools
in the Borough. Regular sampling of the water was carried out
and a total of 24 samples, all of which were satisfactory,
were obtained during 1966.
Public
Swimming
Baths
Strict supervision of the three public swimming baths within
the Borough, two of which are indoor of 120,000 gallons and
68,000 gallons capacity respectively and the Open Air Pool
having 250,000 gallons capacity, was maintained throughout
the year in order to ensure the safety of the water for swimming
purposes. The larger indoor bath and the Open Air Pool are
closed in winter. Regular sampling of the water supply is
made to ensure that the standard of purity required is obtained
by the use of continuous filtration and chlorination processes.
In all cases the analyses of the samples of water taken (13
from the indoor baths and 5 from the Open Air Pool) proved to
be satisfactory. Mains water is used in all baths.
Drainage and
Sewerage
As for last year the flooding of certain areas of the
district was non-existent, because of the furtherance of the
Council's main drainage scheme. The South Woodford Scheme
(£457,000),the Monkhams Valley Scheme (£180,000) and that
in Sunset Avenue (£26,000) have now been completed. There
is no doubt that flooding will be further alleviated by the