[Report of the Medical Officer of Health for Brentford and Chiswick]
This page requires JavaScript
The following list shows the number of defects and other nuisances remedied during the year as a result of notices served:-
| Brickwork, repaired | 10 |
| Choked drains, unstopped | 41 |
| Chimney stacks and flues, repaired and made good | 3 |
| Ceilings, repaired and made good | 77 |
| Doors and Frames, repaired | 17 |
| Dustbins, supplied | 11 |
| Dampness in walls, remedied | 197 |
| Fresh air inlets and interceptor caps etc., provided | 21 |
| Firegrates, cooking stoves, repaired or renewed | 5 |
| Floors, joists and staircases repaired or renewed | 62 |
| Gutterings repaired or renewed or cleaned out | 28 |
| Inspection covers and frames renewed | 21 |
| Leaky roofs and skylights repaired | 68 |
| Plaster to walls, repaired and made good | 67 |
| Rainwater pipes, repaired or renewed | 20 |
| Soil pipe ventilators, repaired or renewed | 8 |
| Sinks replaced | 3 |
| Seats to W.C.’s repaired or renewed | 7 |
| Water waste preventors, repaired or renewed | 25 |
| Walls and ceilings, cleansed or redecorated | 2 |
| Waste pipes, repaired or renewed | 17 |
| Window frames, sash cords, sills, repaired or renewed | 188 |
| W.C.’s replaced | 4 |
| Yard paving, repaired and made good | 7 |
| Miscellaneous items | 66 |
| 975 |
In addition, the following drainage works were carried out during the year under the supervision of Public Health Department officers:-
| Drains tested (smoke) | 49 |
| New soil pipe ventilators fixed | 11 |
| New interceptors fixed | 4 |
| New surface water and soil gullies fixed | 11 |
| New manholes constructed | 5 |
| Manholes reconstructed or repaired | 6 |
| Soil drainage connections repaired or relaid | 20 |
| Soil main drains repaired or relaid | 8 |
| New W.C.’s provided and fixed | 16 |
| New sinks provided and fixed | 8 |
| New sewer connections | - |
| New manhole covers fixed | 2 |
| New surface water lengths fixed | 5 |
| Baths installed (new) | 9 |
| Lavatory basins installed (new) | 13 |
| Drain ventilators fixed | - |
| Waste stack and connections | 2 |