100
Union Road—Extensive repairs have been necessary in this road. The kerbs, for a
length of 540 ft., footways for an area of 2304 square ft., and GOO square yards of pitching
have been relaid; of this latter area 264 square yards was occasioned by the rearrangement
of the levels to suit the wood paving-4aid in front of Christ Church, an area of 58| square
yards belonging to the Tramway Company, the amount charged to them being £8 Is. 4d.
In September last, following the agreement with the Tramway Company, the roadway from
the west side of Cathay Street to the west side of No. 29, a length of 175 ft., was paved with
wood upon a concrete foundation, the area from the kerb to the tram rail on both sides
being executed in " Jarrahdale Jarrah " blocks by the Vestry employees, and the space
between the rails in " Stringy Bark " blocks by the Company ; in both cases the blocks
were 9 in. by 5 in. by 3 in. The cost of the work executed by the Vestry amounted to
£317 10s. 10d., the amount chargeable to the Tram Company for 3 ft. on each side of the
rails being £97 8s. 2d., reduced by the value of the old setts, which we retained, to
£67 14s. lOd.
Cope Street.—The work executed in this street is 430 ft. kerb, and 2621 square ft.
flags relaid, 252 square ft. of new flags have also been laid to replace broken and useless
ones.
Ainstey Street.—This street to the north of Albion Street has been entirely remodelled,
new York edge kerb on both sides has been laid, the footways reflagged, and the roadway
laid with tar macadam upon a foundation of 4 in. of hard core, at an estimated cost of
£180.
Bush Road.— Small repairs have been executed to the kerbs and footways, and the
macadam roadway has been reformed for an area of 1400 square yards, the broken granite
used amounting to 206 tons 8 cwt.
Rotherhithe Street.—Owing to the Gas Company laying a new main from Lavender
Bridge to Silver Street, it was necessary to relay the whole of the footway on the west side to
make a satisfactory job, the area, exclusive of the portion charged to the Gas Company,
amounting to 1457 ft.