77
wellfield Road On the north side new 12-inch by 8-inch
kerb has been laid, the footpath paved with
artificial stone in lieu of the old tar paving, and a paved
crossing laid opposite Blackwood Hall, at a cost of
£236 13s. 8d.
Fontenoy Road. The passage leading to Tooting Bec Common
has been properly drained and the footpath
paved with artificial stone, at a cost of £73 5s. 9d.
sistova Road. The kerb in this road having sunk in several
places and become very uneven it has been
relaid and the tar paving remade, at a cost up to the
present of £102 16s. 9d.
chestnut Grove. The footpath on the south side from the
main road to Boundaries Road has been
paved with artificial stone, at a cost of £106 15s. 4d.
Boundaries Road The footpath in front of the shops on the
east side has been paved with artificial stone
at a cost of £15 12s. 3d.
Trinity Road. The owners of the new shops, Nos. 16 and
18, having given up a strip of land to widen
the road, new 12-inch by 8-inch kerb and 12-inch by
6-inch block channelling have been laid, and the footpath
paved with artificial stone, at a cost of £18 17s. 9d.
RamsdenRoad. Artificial stone has been laid in front of the
new branch library in place of the old tar
paving, at a cost of £23 11s. 9d.
Byrne Road. The tar paving in this road has been repaired
where necessary and its whole surface retopped,
at a cost of £96 3s. 5d.