Hints from the Health Department. Leaflet from the archive of the Society of Medical Officers of Health. Credit: Wellcome Collection, London
Report of the Medical Officer of Health for the year 1950
This page requires JavaScript
WORKS SUPERVISED BY THE SANITARY INSPECTORS (Continued)
HOUSING ACT, 1936 | PUBLIC HEALTH (LONDON) ACT, 1936 | FOOD & DRUGS ACT, 1938 | TOTAL | ||||||
---|---|---|---|---|---|---|---|---|---|
N. | V. | N. | V. | N. | V. | N. | V. | ||
Brought Forward | 17 | - | 1620 | - | 2217 | 211 | 68 | 25 | 415S |
DRAINAGE: | |||||||||
Total Reconstructions. | — | - | - | - | 5 | 16 | - | 21 | |
Partial Reconstructions, repairs or alterations. | - | 1 | 2 | - | 5 | 32 | - | 40 | |
Frontage Drains Reconstructed | - | - | - | - | 16 | 8 | - | 24 | |
Disused Drains sealed off at entry to Sewer | - | - | - | - | 1 | 2 | - | - | 3 |
Obstructions cleared | - | - | 3 | - | 38 | 30 | - | - | 71 |
Inspection Chambers provided | - | 2 | 6 | 114 | - | - | 122 | ||
Inspection Chamber Covers renewed | — | — | 1 | 4 | 1 | — | — | 6 | |
Interceptors provided 00 | - | 1 | 6 | 22 | - | - | 29 | ||
Petrol Interceptors provided | - | - | - | 1 | 1 | - | 2 | ||
Soil & Ventilation Stacks provided or reconstructed, o | - | - | 3 | 0 | 7 | 54 | - | - | 64 |
Soil & Ventilation Stacks repaired,„ | - | — | 3 | - | 6 | 4 | - | 13 | |
Waste & Ventilation Stacks provided or reconstructed,. ,.. | - | 6 | 29 | 92 | - | - | 127 | ||
Waste & Ventilation Stacks repaired. | - | - | 6 | 10 | 7 | — | — | 23 | |
Anti-Syphonage Stacks provided or reconstructed,. .. .. | - | - | - | 2 | 31 | - | - | 33 | |
Anti-Syphonage Stacks repaired or renewed. | 0 | - | _ | _ | 2 | - | - | 2 | |
Fresh Air Inlets provided | — | - | - | - | 1 | 25 | - | - | 26 |
Fresh Air Inlets repaired or renewed | - | 5 | - | 21 | 4 | - | - | 30 | |
Single Sinks provided or renewed | 2 | - | 4 | 18 | 326 | 15 | 7 | 372 | |
Single Sinks repaired | — | - | 17 | - | 12 | 1 | - | 30 | |
Double Sinks provided or renewed Baths provided | - | - | - | - | 2 | 4 | 330 | - | 332 |
Baths renewed | 53 | — | - | 1 | 1 | - | - | 2 | |
Wash-hand basins provided | l | 25 | - | - | 15 | 374 | 8 | 4 | 427 |
Wash-hand basins renewed | - | - | 1 | — | 3 | 2 | 1 | - | 7 |
Waste Pipes cleared of obstructions or repaired | - | - | - | - | 9 | 3 | 1 | - | 13 |
Untrapped Waste Pipes provided with | - | - | 3 | - | 19 | - | 1 | - | 23 |
Soil & Waste Pipes provided (One pipe system) | - | - | - | - | - | 35 | - | - | 35 |
Anti-Syphonage Stacks provided (One pipe system) | - | - | - | - | 35 | - | - | 35 | |
Miscellaneous | - | - | 10 | - | 28 | 64 | 3 | 1 | 106 |
Carried Forward | 20 | 26 | 1687 | - | 2488 | 1831 | 100 | 37 | 6189 |