Hints from the Health Department. Leaflet from the archive of the Society of Medical Officers of Health. Credit: Wellcome Collection, London
Report on the vital and sanitary statistics of the Borough of Lambeth during the year 1902
This page requires JavaScript
80
SUGGESTED REQUIREMENTS FOR UNDERGROUND
BAKEHOUSES, SITUATED WITHIN THE
BOROUGH OF LAMBETH.
The Requirements are Classified as—
I. General (applicable to all Bakehouses in Lambeth
Borough and elsewhere);
II. Special (applicable to Lambeth Bakehouses).
I. GENERAL REQUIREMENTS.
(a). Construction.
(1) Cubic capacity: A minimum of 1,500 cubic feet to be
vided.
(2) Height: A minimum of 7 ft. throughout, measured from the
floor to the ceiling, to be provided (such height to be increased
where the floor space exceeds 150 square feet).
(3) Walls: To be rendered smooth, even, and impervious
throughout, e.g., with (a) suitable cement, (b) glazed bricks
or tiles, or (e) other equally efficient material.
[Tiles are best for the portions of the wall or walls immediately
adjacent to the ovens, cement being liable
to crack or flake with the heat.]
(4) Flooring: To be made of a smooth, even, and impervious
material throughout, e.g., with (a) a minimum of 4ins. of
cement concrete (floated over smooth with cement), (b) tiles
(or flags) on solid foundation and embedded in cement, or
(c) some other equally efficient impervious paving.
(5) Ceilings: To be properly ceiled with smooth, even, and im-
pervious material, e.g., with (a) granite plaster, (b) parian
cement, (c) well-fitting match-boarding properly painted or
varnished, or (d) some other equally efficient material.
(6) Drains : To be constructed of gas- and water-tight pipes and
joints when situated under the Bakehouse, and no gully to be
within the Bakehouse, unless the drain connected therewith
be made to discharge over, or into, a trapped gully outside.
(7) Sinks: To be situated, as far as possible, outside the
house, and all sink-waste pipes to be undertrapped.