Fortieth annual report of the proceedings of the Vestry of the Parish of St. Mary, Newington, London...
This page requires JavaScript
Continued from previous page...
| £ | s. | d. | £ | s. | d. | |
|---|---|---|---|---|---|---|
| Brought forward | 7,056 | 10 | 9 | |||
| Phelp Street—Western Side throughout | ||||||
| 2,205 ft. sup. Victoria Stone Paving | 73 | 10 | 0 | |||
| 30 „ lin. New Flat Kerb | 2 | 17 | 6 | |||
| 471 „ „ Kerb Reset, &c. | 7 | 17 | 0 | |||
| 12 yds. cube Concrete | 8 | 2 | 0 | |||
| 92 | 6 | 6 | ||||
| Ralph Street—Both Sides, from Union Bond to Circular Road | ||||||
| 1,053 ft. sup. Victoria Stone Paving | 35 | 2 | 0 | |||
| 159 „ lin. New Flat Kerb | 15 | 4 | 9 | |||
| 141 „ ,, Kerb Reset, &c. | 2 | 7 | 0 | |||
| 7 yds. cube Concrete | 4 | 14 | 6 | |||
| 57 | 8 | 3 | ||||
| Rockingham Street—North Side, from Uxbridge Street to No. 45 | ||||||
| 2,016 ft. sup. Victoria Stone Paving | 67 | 4 | 0 | |||
| 90 „ lin. New Edge Kerb | 6 | 7 | 6 | |||
| 279 ,, „ Kerb Beset, &c. | 9 | 6 | 0 | |||
| 7 yds. cube Concrete | 4 | 14 | 6 | |||
| 87 | 12 | 0 | ||||
| Rodney Road—North Eastern Side, from Little Trafalgar Place to Chatham Street. | ||||||
| 4,590 ft. sup. Victoria Stone Paving | 153 | 0 | 0 | |||
| 600 „ lin. New Flat Kerb | 57 | 10 | 0 | |||
| 14 yds. cube Concrete | 9 | 9 | 0 | |||
| 219 | 19 | 0 | ||||
| Salisbury Row—South Side, from No. 26 to Chatham Street. | ||||||
| 963 ft. sup. Victoria Stone Paving | 32 | 2 | 0 | |||
| 21 ,, lin. New Edge Kerb | 1 | 9 | 9 | |||
| 180 „ ,, Kerb Beset, &c. | 6 | 0 | 0 | |||
| 4 yds. cube Concrete | 2 | 14 | 0 | |||
| 42 | 5 | 9 | ||||
| Sandford Row—South Street to Blewitt Street. | ||||||
| S45 ft. sup. Victoria Stone Paving. | 31 | 10 | 0 | |||
| 939 „ lin. New Flat Kerb | 89 | 19 | 9 | |||
| 22 yds. cube Concrete | 14 | 17 | 0 | |||
| 136 | 6 | 9 | ||||
| Sandeord Row—from Blackwood Street to Portland Street. | ||||||
| 234 ft. sup. Victoria Stone Paving | 7 | 16 | 0 | |||
| 249 ,, lin. New Flat Kerb | 23 | 17 | 3 | |||
| 6 yds. cube Concrete | 4 | 1 | 0 | |||
| 35 | 14 | 3 | ||||
| Carried forward | 7,728 | 3 | 3 | |||