Hints from the Health Department. Leaflet from the archive of the Society of Medical Officers of Health. Credit: Wellcome Collection, London
Annual report for the year ending 25th March, 1897
This page requires JavaScript
Continued from previous page...
| Table No. 3. | Number of District. | |||||
|---|---|---|---|---|---|---|
| 1 | 2 | 3 | 4 | 5 | Totals | |
| Water Closets- | ||||||
| Old Closets abolished | 17 | ... | 3 | 3 | 9 | 32 |
| New Closets provided | 17 | ... | 1 | 7 | ... | 25 |
| „ „ in Workshops | ... | 2 | 7 | 7 | 15 | 31 |
| Basin and Trap provided | 279 | 150 | 133 | 215 | 339 | 1116 |
| Basins cleansed | ... | ... | ... | ... | 15 | 15 |
| Water Supply provided | 64 | 15 | 11 | 80 | 9 | 179 |
| „ „ Apparatus provided | 48 | 11 | 67 | 131 | 118 | 375 |
| Limewashed | 33 | 20 | 20 | ... | 17 | 90 |
| Walls repaired | 26 | 70 | 11 | ... | ... | 107 |
| Doors provided | 5 | ... | ... | 7 | ... | 12 |
| Ventilated | 6 | ... | 4 | 5 | ... | 15 |
| Seats and risers provided | ... | ... | ... | 4 | ... | 4 |
| Closet floors repaired | ... | ... | ... | 20 | ... | 20 |
| Drains— | ||||||
| Drains re-constructed | 121 | 50 | 47 | 116 | 92 | 426 |
| Cleansed and amended | 129 | 22 | 121 | 102 | 82 | 456 |
| Gully Traps fixed | 469 | 120 | 173 | 124 | 215 | 1151 |
| New Soil Pipes and Vent Pipes fixed | 109 | 10 | ... | 17 | 24 | 161 |
| Chambers built, and Interceptors provided | 68 | 20 | 3 | 36 | 15 | 172 |
| Interceptors only, fixed | ... | ... | ... | 1 | ... | 1 |
| Ventilated | 34 | 7 | 8 | 116 | 71 | 236 |
| Drains provided to Stables | ... | ... | ... | 23 | 2 | 25 |
| Surface Drains constructed | ... | ... | ... | 5 | ... | 5 |
| Sink, Bath and Lavatory Wastes, and Rainwater Pipes— | ||||||
| Disconnected from Drains | 223 | 120 | 109 | 75 | 87 | 614 |
| Cesspools— | ||||||
| Abolished | 4 | 1 | 2 | ... | ... | 7 |
| Dustbins— | ||||||
| Provided | 205 | 102 | 224 | 310 | 348 | 1189 |
| Yards— | ||||||
| Paved | 90 | 20 | 26 | 231 | 83 | 450 |
| Surface repaired | 25 | 190 | 104 | ... | 66 | 385 |
| Scullery and Wash-house Floors— | ||||||
| Paved | 11 | 8 | 12 | 12 | 20 | 63 |
| Forecourts— | ||||||
| Paved | 13 | 30 | 3 | 4 | 26 | 76 |
| Surface repaired | ... | ... | ... | ... | 1 | 1 |
| Gutters, and Rainwater Pipes— | ||||||
| Provided and repaired | 50 | 80 | 50 | 45 | 65 | 290 |
| Water Supply— | ||||||
| Store Cisterns provided | ... | ... | ... | ... | ... | ... |
| „ „ cleansed | 5 | ... | ... | ... | ... | 5 |
| „ „ Covers provided | 22 | 26 | 3 | 71 | 31 | 153 |
| „ „ abolished | 29 | ... | 1 | ... | 6 | 36 |